Time and work; pipes and cisterns

7 real CDS questions of this kind in the 6 papers from CDS I 2024 to CDS II 2026.

Try three questions free ↓
This chapter has a video lessonWatch it, practise with a drill and keep your record, all with a free account. No fee, no card.

Why this chapter matters. This chapter gave 7 questions in the 6 papers from CDS I 2024 to CDS II 2026. They were not spread evenly: CDS I 2024 had four, and three of the six papers had none. Three of the 7 count the work as men multiplied by days. Two are about people who work in turns, one hour or one day each. One is about teams of men and women, and one is an "is the statement enough" question. No question in these six papers was about pipes and cisterns. "Time and work" is named in the syllabus, and a pipe filling a tank is the same mathematics, so it is taught here in brief.

What you will be able to do

  • Turn "A can do a work in 12 days" into a daily rate, and add the rates of people who work together.
  • Use whole-number units of work (the LCM method) to avoid fractions.
  • Count work in man-days when the number of workers changes.
  • Find the finishing time when two people work in turns, and solve a pipe and leak question.

Before you start you should know: fractions and their addition (Chapter A1-2), the LCM of two or three numbers (Chapter A1-5), and inverse proportion (Chapter A2-6).

1. One day's work

If A can do a piece of work in 12 days, then in one day A does ​\frac{1}{12}​ of it. This is A's rate. The whole chapter rests on one rule:

People who work together add their rates. They do not add their times.

A can do a work in 10 days and B can do it in 15 days. In one day they do ​\frac{1}{10} + \frac{1}{15} = \frac{3 + 2}{30} = \frac{1}{6}​ of the work. So together they take 6 days.

For two workers this gives a short formula. If A takes ​a​ days and B takes ​b​ days, together they take

\frac{ab}{a + b} \text{ days}

Check: ​\frac{10 \times 15}{10 + 15} = \frac{150}{25} = 6​.

2. The LCM method: work in units

Fractions are slow. A quicker way is to give the work a size.

Take the total work as the LCM of the given times. Then every rate is a whole number of units.

A takes 4 days and B takes 6 days. The LCM of 4 and 6 is 12, so call the work 12 units. A does ​12 \div 4 = 3​ units a day. B does ​12 \div 6 = 2​ units a day. Together they do 5 units a day, so they take ​\frac{12}{5} = 2.4​ days.

Step What to do
1 Total work = LCM of all the times given
2 Rate of each = total work ÷ time taken alone
3 Add the rates of those who work together; subtract a rate that undoes work
4 Time = work left ÷ rate

This method is used in the rest of the lesson.

3. Man-days

When many equal workers do a job, measure the work as men multiplied by days.

12 men can do a work in 20 days. The work is ​12 \times 20 = 240​ man-days. So 15 men need ​\frac{240}{15} = 16​ days. More men, fewer days: this is inverse proportion.

For the same work done in two ways,

M_1 \times D_1 = M_2 \times D_2

When the number of workers changes part way, find the total man-days first. Then subtract what each stage does.

4. Working in turns

Sometimes two people work on alternate days, one at a time. The method has three steps.

  1. Find the work done in one full round (one day of each).
  2. Take as many full rounds as fit without passing the total.
  3. Finish the last part day by day. See whose turn it is, and what part of a day that person needs.

X takes 4 days and Y takes 6 days. The work is 12 units; X does 3 a day and Y does 2. One round of two days does 5 units. Two rounds (4 days) do 10 units, and 2 units are left.

  • If X began, day 5 is X's turn. X needs ​\frac{2}{3}​ of a day. Total: ​4\frac{2}{3}​ days.
  • If Y began, day 5 is Y's turn. Y needs the whole day. Total: exactly 5 days.

So the answer depends on who starts. The faster worker should go first.

5. Unequal workers: men, women and "twice as fast"

"A is twice as fast as B" means that A's rate is twice B's rate, so A takes half the time that B takes. If B takes 24 days, A takes 12 days.

Men and women (or men and boys). When a question gives two teams that do the same work in the same time, set the two teams equal. This gives the value of a man in terms of a woman.

8 men and 24 women do a work in one day. 12 men and 18 women also do it in one day. So ​8m + 24w = 12m + 18w​, which gives ​6w = 4m​: 2 men do the work of 3 women. Now any team can be counted in one kind of worker.

Before solving, look at the team asked for. If it is a simple multiple of a team that is given, the answer is immediate: a team three times as large takes one third of the time.

6. Pipes and cisterns

A cistern is a tank. A pipe that fills a tank in 12 minutes fills ​\frac{1}{12}​ of it each minute. This is the same idea as one day's work. There is one new thing: an outlet pipe or a leak has a negative rate, because it undoes work.

  • Two inlet pipes fill a tank in 12 minutes and 24 minutes. Take the tank as 24 units. The rates are 2 and 1 units a minute. Together they fill it in ​\frac{24}{3} = 8​ minutes.
  • A pipe fills a tank in 6 hours. Because of a leak, it takes 8 hours. Take the tank as 24 units. The pipe adds 4 units an hour. Pipe and leak together add only 3 units an hour. So the leak removes 1 unit an hour, and it would empty the full tank in 24 hours.

Worked examples

Example 1. A can do a work in 10 days and B in 15 days. They work together for 4 days. Then A leaves. In how many more days will B finish the work?

Take the work as 30 units. A does 3 units a day and B does 2. In 4 days together they do ​4 \times 5 = 20​ units. The work left is 10 units. B alone does 2 units a day, so B needs 5 more days.

Example 2. 36 men can build a wall in 25 days. After 10 days, 6 men leave. In how many more days will the wall be finished?

The work is ​36 \times 25 = 900​ man-days. In the first 10 days, ​36 \times 10 = 360​ man-days are done. The work left is 540 man-days. Now there are 30 men, so the time is ​\frac{540}{30} = 18​ days.

Example 3. A can do a work in 9 days and B in 12 days. They work on alternate days, and A starts. When is the work finished? What changes if B starts?

Take the work as 36 units. A does 4 units a day and B does 3. One round of two days does 7 units. Five rounds (10 days) do 35 units. One unit is left. If A started, day 11 is A's turn, and A needs ​\frac{1}{4}​ of a day: the work takes ​10\frac{1}{4}​ days. If B started, day 11 is B's turn, and B needs ​\frac{1}{3}​ of a day: the work takes ​10\frac{1}{3}​ days.

Example 4. Pipe A fills a tank in 20 minutes and pipe B fills it in 30 minutes. Pipe C empties the full tank in 15 minutes. All three are opened together when the tank is empty. When is it full?

Take the tank as 60 units. A adds 3 units a minute, B adds 2, and C removes 4. Together the gain is ​3 + 2 - 4 = 1​ unit a minute. The tank is full in 60 minutes.

From the real papers

These five questions are from the Elementary Mathematics papers (Series A). The first four are from CDS I 2024, the only paper with a final key that asked this chapter, and the answers agree with that key. The fifth is from CDS I 2026, whose key is still provisional; our answer agrees with it. Try each for 72 seconds before reading the solution.

CDS I 2024, Q45. If the work done by ​x​ men in ​(x + 1)​ days is equal to the work done by ​(x + 5)​ men in ​(x - 2)​ days, then what is the value of ​x​?

(a) 5  (b) 6  (c) 7  (d) 8

Solution. Work is men multiplied by days. So ​x(x + 1) = (x + 5)(x - 2)​, that is ​x^2 + x = x^2 + 3x - 10​. Then ​2x = 10​ and ​x = 5​. Check: 5 men for 6 days is 30 man-days, and 10 men for 3 days is 30. Answer (a).

CDS I 2024, Q59. ​p​ number of men can finish a piece of work in ​q​ days. If there are 50% more men, then the work will be finished 12 days earlier. What is the value of ​q​?

(a) 48  (b) 40  (c) 36  (d) Cannot be determined due to insufficient data

Solution. The work is ​pq​ man-days. With 50% more men there are ​1.5p​ men, and they take ​q - 12​ days: ​1.5p(q - 12) = pq​. The ​p​ cancels, so it is not needed. ​1.5q - 18 = q​ gives ​q = 36​. Check: one and a half times the men need two thirds of the time, which is 24 days. Answer (c).

CDS I 2024, Q29. 50 men can complete a work in 40 days. They begin the work together but a batch of 5 men left after each period of 10 days. What is the time to complete the work?

(a) 45 days  (b) 50 days  (c) 55 days  (d) 60 days

Solution. The work is ​50 \times 40 = 2000​ man-days. The periods of 10 days have 50, 45, 40, 35, 30 men. They do 500, 450, 400, 350, 300 man-days. The running total is 500, 950, 1350, 1700, 2000. The work ends exactly at the end of the fifth period: 50 days. Answer (b).

CDS I 2024, Q20. A, B, C, D can complete a work in 3, 6, 9, 12 hours respectively. Further, only one person can work at a time in each hour and nobody can work for two consecutive hours. It is not necessary to engage all. What is the minimum number of hours that they will take to finish the work?

(a) 36/25  (b) 12/5  (c) 4  (d) 2

Solution. Use the two fastest, A and B, in turns. In one hour A does ​\frac13​ of the work and B does ​\frac16​. Hours 1, 2, 3 as A, B, A give ​\frac13 + \frac16 + \frac13 = \frac56​. No other order does more in three hours, so a fourth hour is needed. It is B's turn, and B does the last ​\frac16​ in exactly one hour. The time is 4 hours. Answer (c). (Option (a) is the time if all four worked together, which the question does not allow.)

CDS I 2026, Q14. X can do a piece of work in 4 days and Y can do the same piece of work in 6 days. Which of the following statements is/are correct?

I. If X and Y work alternately starting with X, then the piece of work will be finished on the fifth day.

II. If X and Y work alternately starting with Y, then the piece of work will be finished in less than 5 days.

Select the answer using the code given below:

(a) I only  (b) II only  (c) Both I and II  (d) Neither I nor II

Solution. This is the example of section 4. The work is 12 units; X does 3 a day and Y does 2. After four days 10 units are done and 2 are left, whoever starts. Starting with X: on day 5, X needs ​\frac23​ of the day, so the work ends on the fifth day. I is correct. Starting with Y: on day 5, Y needs the whole day, so the time is exactly 5 days, not less. II is not correct. Answer (a).

Notice how often the first step was to give the work a size: man-days, or units from the LCM.

Mistakes that cost marks

  1. Adding the times. A takes 10 days and B takes 15 days: together they do not take 25 days, and not the average, 12.5 days. Add the rates: ​\frac{1}{10} + \frac{1}{15} = \frac{1}{6}​, so 6 days. Two workers together are always quicker than the quicker one alone.
  2. Ignoring the last part day in turn work. Do not divide the work by the "average daily rate". Count full rounds, then see whose turn it is. Starting with X and starting with Y can give different answers.
  3. Treating more men as more days. Men and days are in inverse proportion. Keep the product men × days fixed.
  4. Adding a leak or an outlet pipe. A pipe that empties has a negative rate. Subtract it.

Quick check

Do these without help. Answers are at the end.

  1. A alone can do a work in 20 days and B alone in 30 days. In how many days can they do it together?
  2. 24 men can finish a work in 15 days. In how many days can 18 men finish it?
  3. A can do a work in 6 days and B in 12 days. They work together for 3 days and then A leaves. How many more days does B need?
  4. P can do a work in 6 days and Q in 3 days. They work on alternate days, and P starts. In how many days is the work finished?
  5. A tap fills a tank in 10 hours. Because of a leak in the bottom, it takes 15 hours. In how many hours would the leak alone empty the full tank?

Read and watch more, free

NCERT has no chapter on time and work. It has a few such problems under inverse proportion. For the rest, this lesson, the practice site below and the past papers are the material.

What Where Language
Textbook, inverse proportion NCERT Class 8 Ganita Prakash Part II, Chapter 3 Proportional Reasoning-2, section 3.6 Inverse Proportions · Hindi edition English, Hindi
Textbook, the older book NCERT Class 8 Mathematics (older book), Chapter 11 Direct and Inverse Proportions · Hindi edition English, Hindi
Practice with answers NCERT Exemplar Class 8, Unit 10 Direct and Inverse Proportions · Hindi edition English, Hindi
Solved practice IndiaBIX aptitude (open "Time and Work" and "Pipes and Cistern") English
The real papers UPSC previous question papers English, Hindi
Video, a full CDS course R.S SIR: Maths Playlist for CDS 2025 (the time and work and the pipes lessons, about 55 minutes each) Hindi and Hinglish
Video, one long lesson Defence Wallah CDS / AFCAT: Quantitative Aptitude CDS 2024 (the time and work lesson, about 2 hours) Hinglish
Video, a revision marathon CDS Wallah (PW): Maths CDS 2026 (time and work, with ratio and speed) Hinglish

The videos were chosen from their titles, length and views; they have not yet been watched by a teacher.

Answers to the quick check

  1. Take the work as 60 units. The rates are 3 and 2, so together 5 units a day. Time ​= \frac{60}{5} = 12​ days.
  2. The work is ​24 \times 15 = 360​ man-days. 18 men need ​\frac{360}{18} = 20​ days.
  3. Take the work as 12 units. A does 2 a day and B does 1. In 3 days together they do 9 units. 3 units are left, and B needs 3 more days.
  4. Take the work as 6 units. P does 1 a day and Q does 2. One round of two days does 3 units, so two rounds finish the work: 4 days.
  5. Take the tank as 30 units. The tap adds 3 units an hour. Tap and leak together add 2. The leak removes 1 unit an hour, so it empties the tank in 30 hours.

Next chapter: Time, speed and distance.

Free · no sign-up

Try three questions on this chapter

Exam-pattern questions from this chapter's drill. Pick an answer for each, then check.

  1. Question 1 of 3
    A can do a piece of work in 8 days and B can do it in 12 days. They work on alternate days, one at a time, and A works on the first day. In how many days is the work finished?
  2. Question 2 of 3
    A question is given followed by two statements I and II. Consider the Question and the Statements and mark the correct option.
    Question: In how many days can 20 men finish a piece of work?
    Statement-I: 15 men can finish the work in 16 days.
    Statement-II: 20 men and 10 women together can finish the work in 10 days.
    Which one of the following is correct in respect of the above Question and the Statements?
  3. Question 3 of 3
    A contractor agrees to build a road in 60 days and puts 30 men on it. After 40 days he finds that only half the road is built. How many more men must he put on to finish the road in time?
Free sign-up

You have read the chapter. Now make it stick.

A free account adds the video lesson, a drill of ten questions on this chapter marked like the exam, the timed mock papers, a study plan to your exam date and your own record of what you have done. No fee, no card.

Past questions quoted are from the official UPSC paper named in the text; the working is WishWas's own, checked against UPSC's answer key where one has been published. The links under “Read and watch more” go to free material on other sites; nothing is copied.